Preparation is key in our industry as project lead times often exceed five years, yet construction and installation windows can sometimes be quite limited. Throughout all phases, from pre-FEED up to abandonment, the need for unambiguous specifications and procedures are critical to the success of any offshore project. Carefully aligning these parameters with project goals will eventually determine the outcome of the project — and that is our primary focus in the planning and executing of all our engineering works.
Transportation Engineering
- Ballasting Procedures
- Tow Tug Bollard Pull Calculation
- Towing arrangement & procedure
- Lifting, Skid Beam, Link Beam Design
- Loadout Procedure
Inspection Supervision
- Vessel Suitability Survey
- Grillage & Sea Fastening Inspection
- Loadout & Installation Supervision
- Float Over Supervision
- Pre-lay Anchor Marine Supervision
Feasibility Study
- Vessel Selection
- Passage Plan & Tow Route Assessment
- Stowage & Lashing Plan
Installation Engineering
- Technical Lifting & Upending Analysis
- Jacket Launching Analysis
- Installation Aids Design
- Coupled Dynamic Lifting Analysis
Loadout Engineering
- Stability / Longitudinal Strength Check
- Seakeeping / Station Keeping Analysis
- Motion Analysis
- Grillage & Sea Fastening Design
- Quay Side Strength & Mooring Analysis
Consultancy
- Wet / Dry Transportation Consultancy
- Drafting & Review of Offshore Project Related Procedures
- Mooring / Anchor Patterns
- Anchor Handling / Rig Moves Procedures